AIM Framework glossary

PM Production Cost Asymmetry

Canonical definition

The PM Production Cost Asymmetry is the Salience Substitution Principle's channel-gate cost term: ongoing intrinsically driven emission spends the Individual's own effort and resources (practice, craft, materials, tools), and a single transgressive act draws maximum Salience without spending those resources. Valence-Neutral Status ensures both return equivalent Mimetic Premium once integrated.

Explanation

It costs far more of a person's own effort, materials, tools, practice and craft to become noticed by making something than by performing one act that draws attention. The brain's Status-tracking system does not distinguish the two once the notice arrives.

Epistemic status

Framework-Specific Construct.

Derivation

Chapter 8, Section 8.11.5.

Related terms